01 / How it starts

Three steps from a 30-minute scope call to signed contracts

We do not quote a number before we understand the day. Below is the sequence in full, including the deliverable you receive at each stage and what we do if a venue or supplier falls through.

  1. 00:30

    Scope call, 30 minutes

    In English or Ukrainian we fix four things: guest count range, city (Kyiv, Lviv, Odesa or a nearby destination), season, and decoration ambition. No deposit and no obligation. If your date sits outside our working calendar, we say so on the call, not in an email a week later.

  2. +5 days

    Written proposal

    A document, not a phone quote. It lists venue coordination and decoration planning scope, a supplier plan with named categories and lead times, a day-of scheduling outline, the fee, and the assumptions behind it. Two revision rounds are included before you commit to anything.

  3. 7-day hold

    Confirmation

    We hold the date for seven days while you review. Signing the coordination agreement and paying the first instalment locks the team. Venue and supplier availability is confirmed only once their own contracts and deposits are in place, and we state that in writing on every proposal.

Next: the phase table with owners and deliverables for each stage. See the phase breakdown or book a scope call.

Five phases, one owner per row

Each phase runs on a fixed duration and a written deliverable. The owner named in the row answers for it. If a venue or supplier slips, the fallback rule in the same row sets the next move.

  1. 012 weeks

    Scope call and proposal

    Written scope, guest count, venue shortlist and budget range.

    FallbackIf the shortlist is rejected, a second list follows in 72 hours.

    Owner

    Lead planner

  2. 024 to 6 weeks

    Venue and contract coordination

    Site visits, contract review and deposit schedule.

    FallbackIf the first venue is unavailable, a backup is held for five days.

    Owner

    Venue coordinator

  3. 036 to 8 weeks

    Decoration and supplier lock

    Floor plan, decoration schedule and supplier contracts.

    FallbackIf a supplier withdraws, the approved alternate from the backup list is contacted.

    Owner

    Design lead

  4. 043 weeks

    Final run-sheet and rehearsal

    Minute-by-minute run sheet, contact tree and rehearsal plan.

    FallbackIf timing slips, earlier buffer blocks are released first.

    Owner

    Production manager

  5. 051 day

    Event day delivery

    Live schedule, supplier check-in and guest flow handover.

    FallbackIf weather changes, the indoor plan starts two hours before the ceremony.

    Owner

    On-site manager

04 / Event day sample

Sample run-sheet: a 90-guest wedding in Kyiv, 14 September

Every time below is a contractual call time, not an estimate. Each line names the owner, the location and the fallback the coordinator can trigger without a group call.

TimeActionOwnerLocationFallback
09:00Supplier load-in and gate accessLogistics coordinatorService yard, gate 210:30 window if the queue stalls
11:30Decoration install sign-offDecoration leadMain hallTable plan falls back to 7 rows if florals run late
14:30Ceremony rehearsalCeremony leadTerraceMoves to Hall B in rain, seating shifted by 15:00
16:00Guest arrival and welcome drinksFront-of-house leadGarden courtCovered veranda, same staffing count
17:00Ceremony startLead coordinatorTerraceMusic cue held to 17:05 if the officiant is late
18:30Dinner serviceCatering managerMain hallBuffet switch with a 20 minute buffer
22:00Supplier release and final walkthroughLogistics coordinatorService yardOvernight storage fee pre-approved in contract

Call times are written into supplier contracts before the day. When a fallback triggers, the coordinator logs it and announces the change once, instead of chain-calling the wedding party. The full owner matrix sits on the roles and fallbacks list.

05 / Roles & fallbacks

Who owns what, and what happens when a supplier falls through

Every line on the run-sheet carries one named owner. If that owner is unreachable, the fallback rule applies without anyone deciding it on the day.

  1. 01 / Planner

    Run-sheet and schedule ownership

    Builds the phase timeline, holds supplier agreements, confirms load-in windows and issues the final event-day schedule to every party 72 hours before the date.

    FallbackSecond coordinator on the file steps in; the printed schedule at the venue desk is authoritative.

  2. 02 / Supplier

    Delivery against contract

    Delivers the agreed scope, insurance and crew at the contracted time. Availability is confirmed only after the separate supplier contract and deposit are in place.

    FallbackBackup supplier from the shortlist, with the cost difference agreed in writing before substitution.

  3. 03 / Client

    Decisions and approvals

    Approves the guest count, decoration direction and venue shortlist by the stated deadlines. One decision-maker per household keeps approvals from stalling the schedule.

    FallbackUnapproved items are held at the last confirmed version; the timeline does not wait.

Three standing rules

  • Silence is not approval. An unanswered request reverts to the last written version after 48 hours.
  • No cash on site. Supplier balances settle by contract, never from the wedding-day envelope.
  • One escalation line. Any delay over 20 minutes goes to the lead planner first, then to the venue manager.

05 / Next step

Tell us the date. We will show you what that week looks like.

One 30-minute scope call, then a written proposal with phases, owners and fallback rules. We are not a venue and not a booking platform, and we take no undisclosed supplier commissions.

Request a scope call

Response within 1 business day · Mon–Fri, 10:00–18:00 Kyiv time

Venue and supplier availability is confirmed only after separate contracts and deposits. Nothing in the draft run-sheet holds a date. If a phase owner is unavailable, the fallback listed in roles and fallbacks takes over.